– Fairly priced.

Auction products.

Bid on Prisma for our current storage products.

Jemgum SY 23/24

Jemgum SY 23/24

Storage location

Jemgum (market area THE and TTF)

Allocation date

11/05/2023, 11:00–11:30 CET

Contract period

01/06/2023–01/04/2024

Allocation mode/Pricing

Key procedure/Pay-as-bid

Plattform

PRISMA

Capacity on offer

300 GWh

view more

Bundle structure

 

Volume firm

Volume interr.

Injection firm

Injection interr.

Withdrawal firm

Withdrawal interr.

01/06/2023–01/04/2024

0 kWh

30.000.000 kWh/h

0 kWh/h

0 kWh/h

0 kWh/h

0 kWh/h

Price model

Storage feeFixed price
Variable injection fee

Variable withdrawal fee

Service fee

Technical limitations

Renomination lead time delivery point 1

2 h

Renomination lead time delivery point 2

1/2 h

Technical lead times

Min flow

Miscallaneous

Interruption at storage level of 92%

Transport / Delivery Points

 

Name

TSO

Market Area

Point-ID entry/exit

Offered Transport Capacity

Delivery point 1

Jemgum I

GASCADE Gastransport GmbH

THE

1BMA

bFZKtemp (exit), UBK

Delivery point 2

Oude Statenzijl (astora Jemgum)

Gas Transport Services B.V. (GTS)

TTF

3433P/3433I

FZK, UBK

Injection Curve

Withdrawal Curve

Miscallaneous / Comments

  • Unbundled volume (also for new customers)
  • Short-term combination with injection and withdrawal rates
  • No curves apply to interruptible capacity
  • Price for injection rate until 01.10.23 is 0.46 €/MWh
  • Price for withdrawal rate until 01.10.23 is 0.46 €/MWh
  • Portal communication with possibilities to upgrade to ASX-communication
  • Withdrawal obligation/day at 33% of the booked interruptible working gas capacity
  • Prepayment

open PRISMA Capacity Platform

Additional capacities and services

Additional capacities

There is more for you. Short-term capacities from within-day to all year round. 

view more

Interruptible services

Here you will find all useful information about interruptible capacities: Ranking, reduction rules and ways to avoid interruptions.

view more

Remit

Time is money. We take over your storage status report to the authorities.  

view more

*min. time to fully inject/withdraw using firm rates without consideration of storage curves 
** min. time to fully inject/withdraw using firm and interruptible rates without consideration of storage curves