– Fairly priced.

Auction products.

Bid on Prisma for our current storage products.

Jemgum SY 24/25 – 1.0 TWh

Jemgum SY 24/25 – 1.0 TWh

Storage location

Jemgum (market area THE/TTF)

Allocation date

15/06/2023, 14:00–14:30 CET

Contract period

01/04/2024–01/04/2025

Allocation mode/Pricing

Key procedure/Pay-as-bid

Plattform

PRISMA

Capacity on offer

1,003 GWh

Structure firm*

63 / 42 [days]

Structure interr.**

– / – [days]

view more

Bundle structure

Storage capacity

Volume firm

Volume interr.

Injection firm

Injection interr.

Withdrawal firm

Withdrawal interr.

167,131,042 kWh

0

111,667 kWh/h

0

166,667 kWh/h

0

Transport capacity "GTS"

Exit capacity firm

Entry capacity firm

77,418 kWh/h

117,300 kWh/h

Price model

Storage feeFixed price
Variable injection fee

0

Variable withdrawal fee

0

Service fee

0

Technical limitations

Renomination lead time delivery point 1

2 h

Renomination lead time delivery point 2
(under the conditions published by GTS)

1/2 h

“Legal” filling level requirements

“Mining law” filling level requirements

Transport / Delivery Points

 

Name

TSO

Market Area

Point-ID entry/exit

Offered Transport Capacity

Delivery point 1

Jemgum I

GASCADE

THE

1BMA

bFZKtemp (exit), UBK

Delivery point 2

Oude Statenzijl (astora Jemgum)

GTS

TTF

301391

FZK, UBK

Injection Curve

Withdrawal Curve

Miscallaneous / Comments

  • The transport capacities are transferred on PRISMA free of charge via secondary marketing.

open PRISMA Capacity Platform

Additional capacities and services

Additional capacities

There is more for you. Short-term capacities from within-day to all year round. 

view more

Interruptible services

Here you will find all useful information about interruptible capacities: Ranking, reduction rules and ways to avoid interruptions.

view more

Remit

Time is money. We take over your storage status report to the authorities.  

view more

*min. time to fully inject/withdraw using firm rates without consideration of storage curves 
** min. time to fully inject/withdraw using firm and interruptible rates without consideration of storage curves